In 2026, wrong answers are only wasted if you never see them again. The PK0-400 test engine keeps surfacing your mistakes until they stop being mistakes, and Real4Prep pairs it with 96 verified practice questions.
CompTIA PK0-400 Exam Overview:
| Certification Vendor: | CompTIA |
|---|---|
| Exam Name: | CompTIA Project+ Certification Exam |
| Exam Number: | PK0-005 |
| Certificate Validity Period: | Good-for-life (no renewal required under current CompTIA Project+ policy) |
| Passing Score: | 710 (on a scale of 100-900) |
| Real Exam Qty: | Maximum 90 questions |
| Exam Duration: | 90 minutes |
| Related Certifications: | CompTIA Network+ PRINCE2 Foundation CAPM CompTIA A+ CompTIA Security+ |
| Exam Format: | Multiple-choice (single and multiple response), Performance-based questions |
| Exam Price: | $348–$399 USD |
| Available Languages: | English, Thai, Japanese |
| Recommended Training: | CompTIA CertMaster Learn (Project+) CompTIA Official Study Guide |
| Exam Registration: | Pearson VUE Exam Scheduling CompTIA Project+ Official Registration |
| Sample Questions: | ![]() |
| Exam Way: | Online proctored or in-person testing via Pearson VUE |
| Pre Condition: | No formal prerequisites required; recommended 6–12 months project management experience or equivalent knowledge |
| Official Syllabus URL: | https://www.comptia.org/certifications/project |
CompTIA PK0-400 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Communication and Change Management | 19% | - Change control process
|
| Topic 2: Project Lifecycle Phases | 30% | - Initiation
|
| Topic 3: Project Tools and Documentation | 18% | - Project management tools
|
| Topic 4: Project Management Concepts | 33% | - Project characteristics and methodologies
|
PK0-400 Exam Questions and Answers
You can register for the CompTIA Project+ exam through the official channels:
Many candidates combine practice questions with official training. Recommended options include:
No formal prerequisites required; recommended 6–12 months project management experience or equivalent knowledge
You can confirm the current eligibility requirements on the official PK0-400 exam page before you register.
The engine lets you set the same time limit and marking scheme as the real exam, so every session trains your pace, not just your knowledge. It also resurfaces the questions you answer wrong until they stick, and lets you hide the ones you always get right — together, these keep your speed and confidence climbing steadily.
The CompTIA Project+ exam requires a score of 710 (on a scale of 100-900) to pass, and the official registration fee is $348–$399 USD. Careful preparation is the most practical protection for that fee.
Very much so. The PDF version is designed to be printed, which makes it ideal for shared preparation: print copies for everyone, meet up, and discuss the questions together. Candidates preparing as a team or buying for a company often choose this version precisely because paper travels well in a meeting room.
The CompTIA Project+ practice questions are organized around the official exam objectives. Key topics include:
- Project Management Concepts (33%)
- Project Tools and Documentation (18%)
- Project Lifecycle Phases (30%)
Group discussion works especially well when everyone is working through the same topic list.
The CompTIA Project+ exam contains Maximum 90 questions questions, and you will have 90 minutes minutes to complete them. Practicing at this exact pace is how answer speed is built.
This package includes 96 practice questions for the CompTIA Project+ exam. Every answer is verified by an experienced team of experts, so you can trust what you study.
CompTIA Project+ Sample Questions:
A project manager is justifying a required change with the associated impact on the project.
Which of the following is the NEXT step?
- A. Validation
- B. Approval
- C. Auditing
- D. Implementation
Correct Answer: B 🗳️
Which of the following activities are associated with the closing phase of a project? (Choose two.)
- A. Archiving of project documents
- B. Lessons learned
- C. Quality assurance
- D. Tracking of expenditures
- E. Risk mitigation
Correct Answer: A,B 🗳️
A stakeholder is unaware of a project's status.
Which of the following documents should the project manager consult to ensure all stakeholders are notified of project changes? (Choose two.)
- A. Organizational chart
- B. Status report
- C. Communication plan
- D. RACI matrix
- E. Meeting minutes
Correct Answer: B,E 🗳️
A project manager who is part of a global team wants to have a team building meeting and decides to hold a video conference.
Which of the following is MOST likely to be the main challenge the influences this decision?
- A. Technology factors
- B. Language barriers
- C. Geographical factors
- D. Cultural differences
Correct Answer: C 🗳️
A project team is mainly based in a metropolitan area. The team also has members in a remote area, where Internet access is limited and unstable.
Which of the following factors will MOST likely influence the communication methods used in the project?
- A. Personal preferences
- B. Language barriers
- C. Technological factors
- D. Cultural differences
Correct Answer: C 🗳️