SAP C_IBP_2111 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Define and view information with user-defined charts and dashboards
  • Analytics and Reporting
Topic 2
  • Describe the benefits of implementing SAP's Integrated Business Planning solution
  • Demand Planning. Solution Architecture. S&OP Review
Topic 3
  • Configure supply planning, run various solvers to generate planning results
  • Supply and Response
Topic 4
  • Describe how IBP extends the logic of S&OP in the network using advanced demand and supply planning integrated with financial plans
Topic 5
  • Planning Operators & Application Jobs
  • Use Planning Operators
Topic 6
  • Create statistical forecast using historical data with basic methods
  • Use the Fiori Launchpad to customize the UI, work with Excel UI
Topic 7
  • Display, create, copy, edit, check, and activate a planning area
  • General Configuration of a Planning Area
Topic 8
  • Create and use key figures and attributes
  • Key Figures & Attributes

 

NEW QUESTION 29
What actions can be performed in the Advanced Dashboards application? Note: There are 3 correct Answers to this question.

  • A. Rename the charts.
  • B. Link two analytics charts.
  • C. Display all assigned analytics on a single UI.
  • D. Organize charts.
  • E. Add process templates.

Answer: C,D,E

 

NEW QUESTION 30
You are using the Resource Location master data type. How do you specify capacity supply as time- dependent?

  • A. Set the Capacity Supply additional attribute in the time profile.
  • B. Set the Capacity Supply Time Series indicator in the Resource Location master data type.
  • C. Maintain the CAPASUPPLY key figure values in the planning area.
  • D. Set the Capacity Supply Time Series indicator attribute as a key.

Answer: B

 

NEW QUESTION 31
Which of the following functional areas are included in the out-of-the-box SAP Integrated Business Planning application for sales and operations? Note: There are 3 correct Answers to this question.

  • A. Demand-driven materials requirement planning
  • B. Rough-cut supply planning
  • C. Finite resource capacities planning
  • D. Executive review
  • E. Consensus demand planning

Answer: B,D,E

 

NEW QUESTION 32
What are the ways to achieve rolling aggregation with SAP IBP?

  • A. Using local member
  • B. Using key figure calculation
  • C. Using attribute as a key figure
  • D. Using aggregation mode average

Answer: D

 

NEW QUESTION 33
What are some of the available ABC segmentation methods in IBP? Note: There are 2 correct Answers to this question.

  • A. By Pareto Principle (Sorted and Cumulated %)
  • B. By Pareto Principle (Sorted and Calculated Values)
  • C. By Number of Items (Sorted Average)
  • D. By Number of Items (Sorted Values)

Answer: B,D

 

NEW QUESTION 34
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?
Note: There are 3 correct Answers to this question.

  • A. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
  • B. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
  • C. It checks whether the required planning level master data exists for a subset of input key figures.
  • D. It checks whether the sourcing in the Production Source Item Master Data type exists.
  • E. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.

Answer: B,C,E

 

NEW QUESTION 35
You are modeling a substitution scenario associated with a promotion. What are some of the Master Data parameters that you need to maintain to ensure desired results generated by the optimizer? Note: There are 2 correct Answers to this question.

  • A. Flag 'Disable Substitution of Location Products
  • B. Promotion duration
  • C. Location Product Sub Cost Rate
  • D. Loc-Prod Subst Valid-From Date

Answer: B,D

 

NEW QUESTION 36
Which are the mandatory preconditions for an attribute that can be used for saving the segmentation results? Note: There are 2 correct Answers to this question.

  • A. It should be a non-key attribute of the master data type.
  • B. It belongs to a simple or compound master data type.
  • C. The length of the attribute needs to be 18 digits.
  • D. Its data type is INTEGER and its length has been specified.

Answer: A,B

 

NEW QUESTION 37
You have set up a planning area and data is available. You adjust the necessary time profile settings and run the consistency check. Which settings can you change and still run a successful consistency check? Note:
There are 2 correct Answers to this question.

  • A. Remove an attribute assigned to the time profile level if the attribute is used in a planning level.
  • B. Add a new time profile level to the time profile.
  • C. Change the description of the attributes in the time profile.
  • D. Change the past and future horizon of the levels in the time profile.

Answer: C,D

 

NEW QUESTION 38
Which of the following approaches could you take to reduce run times of an optimizer? Note: There are
2 correct Answers to this question.

  • A. Use a subnetwork ID to reduce the size of the problem.
  • B. Increase the use of incremental lot size beyond the frozen horizon.
  • C. Avoid using telescopic time buckets.
  • D. Split into multiple planning areas to support weekly vs. daily planning needs.

Answer: A,C

 

NEW QUESTION 39
You are creating advanced copy operators as part of an SAP IBP solution that is being implemented.
What do you need to be aware of when defining data transfer? Note: There are 2 correct Answers to this question.

  • A. Specifying source key figure is mandatory.
  • B. Selecting by attribute with option 'contain' is possible.
  • C. Specifying target key figure is mandatory.
  • D. Specifying target key figure that is time independent is possible.

Answer: A,C

 

NEW QUESTION 40
What are some of the prerequisites for configuring a planning area that results in a successful consistency check? Note: There are 2 correct Answers to this question.

  • A. Assign the compound master data type and its component master data types.
  • B. Configure at most two input key figures on the same planning level in a key figure calculation.
  • C. Specify a planning horizon in the planning area for each level of the assigned time profile.
  • D. Configure at least one calculated key figure for the planning area.

Answer: A,C

 

NEW QUESTION 41
Which property of an attribute will allow it to be used as an attribute as a key figure?

  • A. Type INTEGER
  • B. Type DECIMAL
  • C. Type TIMESTAMP
  • D. Type NAVCHAR

Answer: B

 

NEW QUESTION 42
Which of the following are functions of SAP IBP for demand? Note: There are 3 correct Answers to this question.

  • A. Demand sensing of demand data using predictive analytics tools
  • B. Embedded, on-the-fly demand analytics
  • C. Detailed statistical analysis of demand data using the supply chain algorithm library
  • D. Demand sensing of demand data using the supply chain algorithm library
  • E. Detailed statistical analysis of demand data using predictive analytics tools

Answer: B,C,D

 

NEW QUESTION 43
What is a prerequisite for modeling outsourced manufacturers with production capacity?

  • A. Model production costs for internal and external production resources to model priority.
  • B. Ensure that multiple modes of transportation are set up.
  • C. Model target inventory and stocks at the outsourced location.
  • D. Use production lead times and offsets to manage components at the outsourced location.

Answer: A

 

NEW QUESTION 44
You are working to realign the data due to a recent warehouse closure. What should you be aware of in regards to configuration of realignment steps? Note: There are 2 correct Answers to this question.

  • A. The name of the realignment step should be no longer than 20 characters.
  • B. The number of steps in realignment run is limited to 255.
  • C. If a realignment step fails, subsequent steps are not processed.
  • D. The realignment step status must be set to In Review for it to be executed.

Answer: C,D

 

NEW QUESTION 45
You created a key figure and want to add calculations. Which of the following rules do you consider?
Note: There are 2 correct Answers to this question.

  • A. All key figure calculations have calculation inputs, which can be marked as stored or calculated.
  • B. Key figures can be calculated across different planning levels.
  • C. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation U level.
  • D. The calculation chain for a key figure must always result in a calculated key figure.

Answer: A,B

 

NEW QUESTION 46
What function would you use to configure a year-to-date calculation?

  • A. Dynamic Rolling Aggregation
  • B. Cumulative Aggregation
  • C. Last Period Aggregation
  • D. Rolling Aggregation

Answer: B

 

NEW QUESTION 47
You created a key figure and want to add calculations. Which of the following rules do you consider?
Note: There are 2 correct Answers to this question.

  • A. All key figure calculations have calculation inputs, which can be marked as stored or calculated.
  • B. Key figures can be calculated across different planning levels.
  • C. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation level.
  • D. The calculation chain for a key figure must always result in a calculated key figure.

Answer: A,B

 

NEW QUESTION 48
......