NEW QUESTION 21
ICNV initialization does 3

  • A. Build index on flag column
  • B. Creation of views
  • C. AA
  • D. Creation of flag

Answer: A,B,D

 

NEW QUESTION 22
You downloaded content from the SAP note 1000009 ("ASU Toolbox 2008"). Which transaction needs to be executed to use that content in the ASU Toolbox?
Please choose the correct answer.
Response:

  • A. /ASU/START (Start ASU Toolbox)
  • B. /ASU/UPGRADE (Start ASU Toolbox in Upgrade Mode)
  • C. /ASU/SHOW_NOTE (Show SAP Note via Web-Browser)
  • D. /ASU/SSM (ASU Simple Schedule Manager)

Answer: A

 

NEW QUESTION 23
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:

  • A. Install add-on SAP Gateway 7.50
  • B. Uninstall Fiori apps not released for SAP_UI 7.50
  • C. Uninstall industry extensions not supported by SAP S/4HANA
  • D. Delete client 066 (Early Watch Client)

Answer: B,D

 

NEW QUESTION 24
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.
Response:

  • A. An SAP S/4HANA conversion is performed, without adapting the customer data.
  • B. An upgrade of the software components is performed, without changing the database type.
  • C. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
  • D. A change of the database type is performed, without changing the software components.

Answer: D

 

NEW QUESTION 25
Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?

  • A. The corrections to the SUM Guide
  • B. The link to different patch levels to SUM
  • C. AA
  • D. An overview about possible upgrade paths

Answer: A,B,D

 

NEW QUESTION 26
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:

  • A. Using the main configuration option "Single System" in case of an upgrade.
  • B. Using the database migration option (DMO) for SUM
  • C. Using the main configuration option "Standard" when applying SAP Support Packages
  • D. Using the main configuration option "Single System" when installing an Add-On

Answer: D

 

NEW QUESTION 27
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.

  • A. The transport between Unicode and non-Unicode systems is forbidden.
  • B. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
  • C. The upgrade of the PRD must be finished before you start new development in the DEV.
  • D. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.

Answer: B

 

NEW QUESTION 28
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:

  • A. The repository is migrated in uptime
  • B. Dedicated application tables are migrated in uptime
  • C. TABIMJJPG is executed in uptime
  • D. An additional temporary database is used during uptime

Answer: B

 

NEW QUESTION 29
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

  • A. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
  • B. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
  • C. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.
  • D. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.

Answer: B

 

NEW QUESTION 30
During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure?
There are 3 correct answers to this question.
Response:

  • A. Creation of the table structures in the new SAP HANA database
  • B. Execution of eCATTs for business validation tests
  • C. Execution of SPAU modification adjustment
  • D. Execution of SPDD modification adjustment
  • E. Execution of XPRAs and AIMs

Answer: B,C,E

 

NEW QUESTION 31
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
There are 2 correct answers to this question.
Response:

  • A. SAT (Runtime Analysis)
  • B. SYCM (Simplification Database Content)
  • C. SE80 (Object Navigator)
  • D. ATC (ABAP Test Cockpit)

Answer: C,D

 

NEW QUESTION 32
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA.
What do you need to consider? Note: there are 2 correct answers to this question.

  • A. The target database size increases temporarily because of the Shadow Repository.
  • B. SAP HANA Landscape Reorganization required a manual step to edit a file.
  • C. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
  • D. Network capacity between exporting and importing R3load processes must be.
  • E. The source system is non-Unicode and the target database is a scale-out system.

Answer: B,C

 

NEW QUESTION 33
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:

  • A. Check the compatibility of custom code with SAP S/4HANA
  • B. Apply the recommendations of the simplification list
  • C. Run the database migration to the SAP HANA database
  • D. Perform the migration of data into the new data structure

Answer: A,B

 

NEW QUESTION 34
What are the benefits of using the Benchmarking option of the DMO for SUM?
There are 2 correct answers to this question.
Response:

  • A. You can verify that the content of the download directory matches the stack.XML file.
  • B. You can obtain migration duration files that can be used to optimize the next runs from a previous benchmark run.
  • C. You can record the modification adjustment during migration and use the transports in the next runs.
  • D. You can find the optimal number of parallel R31oad processes by monitoring host performance.

Answer: C,D

 

NEW QUESTION 35
You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of programs and other non-dictionary repository objects (SPAU)?
Please choose the correct answer.

  • A. Credentials of user DDIC in client 000 of the shadow system
  • B. Credentials of user DDIC in the development client of the development system
  • C. Credentials of a named user in the development client of the development system
  • D. Credentials of a named user in client 000 of the shadow system

Answer: C

 

NEW QUESTION 36
You are running an SAP ECC system. For which of the following activities does SUM allow you to use the Near Zero Downtime Maintenance (NZDM) capabilities?
There are 3 correct answers to this question.
Response:

  • A. Perform an SAP S/4HANA conversion including DMO.
  • B. Use DMO for SUM.
  • C. Apply SAP Support Packages.
  • D. Upgrade the SAP system.
  • E. Apply an Enhancement Package.

Answer: C,D,E

 

NEW QUESTION 37
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:

  • A. It is a database-specific document
  • B. It contains a section "free space requirements"
  • C. It is target release specific
  • D. It contains a troubleshooting section

Answer: B,C

 

NEW QUESTION 38
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.

  • A. Dual Stack split
  • B. Homogenous system copy
  • C. Database migration
  • D. Release upgrade
  • E. Support Package Stack update

Answer: C,D,E

 

NEW QUESTION 39
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"?
There are 2 correct answers to this question.
Response:

  • A. Keep archiving on during the whole procedure.
  • B. Reuse a profile for the shadow instance from a previous run.
  • C. Use the Near Zero Downtime Maintenance Technology (NZDM).
  • D. Choose the instance number of the shadow instance.

Answer: B,D

 

NEW QUESTION 40
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.

  • A. Kernel for target release, Linux, SAP HANA
  • B. Kernel for target release, Windows, SAP HANA
  • C. Kernel for target release, Windows, SAP MaxDB
  • D. Kernel for source release, Windows, SAP MaxDB

Answer: B,D

 

NEW QUESTION 41
During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?
There are 2 correct answers to this question.
Response:

  • A. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log
  • B. In the job log for the corresponding job in SM37 (Job Overview)
  • C. In the corresponding R3trans log files of this phase
  • D. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp

Answer: A,B

 

NEW QUESTION 42
You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
Response:

  • A. Activate the required business functions manually in the production system.
  • B. During conversion, SUM delivers some business functions already activated.
  • C. Import a transport request from the development system that contains the recording of the activation.
  • D. Specify the business functions that need to be switched on during the prepare part of SUM.

Answer: B,C

 

NEW QUESTION 43
......