Understanding functional and technical aspects of Manage and Optimize Performance

The following will be discussed in NUTANIX NCSE-CORE dumps:

  • Monitor CPU/Memory utilization to identify problems and propose solutions
  • Install and configure a REST client to trigger REST API and generate code snippets
  • Describe the REST API and demonstrate how to use the REST API explorer
  • Analyze existing network configuration and adjust for optimal performance (NLB, Bond configuration)
  • Describe and monitor storage performance and methods of optimization
  • Execute PowerShell cmdlets in interactive and batch modes
  • Identify the capabilities of the Enterprise Cloud as they relate to performance of AOS clusters, AHV hosts and VMs
  • Determine correct system storage settings for compression, deduplication, erasure coding and validate expected savings

How much NUTANIX NCSE CORE Exam Cost

The price of the NUTANIX NCSE CORE exam is $199 US.


Understanding functional and technical aspects of Network Security

The following will be discussed in NUTANIX NCSE-CORE dumps:

  • Configure security for Nutanix Enterprise Clouds
  • Given a scenario, implement Nutanix Files
  • Given a scenario, secure workloads
  • Given a scenario, optimize performance for specific workloads
  • Configure Data Protection to meet customer HA/DR requirements
  • Given a scenario, troubleshoot storage
  • Given a scenario, implement Nutanix Volumes
  • Validate Disaster Recovery configurations
  • Given a scenario, migrate workloads
  • Configure infrastructure for workloads
  • Configure security to leverage external authentication/authorization resources

 

NEW QUESTION 90
A systems engineer provides a demo to a prospective customer who wants to be more hands on with Nutanix Which two resources can the customer leverage without support from a systems engineer or Nutanix? (Choose two)

  • A. Foundation
  • B. Hosted POC (HPOC)
  • C. Community Edition (CE)
  • D. Test Drive

Answer: C,D

 

NEW QUESTION 91
A systems engineer is creating a configuration in Sizer for a customer that is building an app for use as an ebooks repository The app requires the following two workloads : 1. 50 generic web server VMs, each with 2 vCPUs on a 4:1 vCPU ratio, 8 GB of RAM, and 100GB of storage each 2. A fileserver workload with 80TB of usable storage available, which contains mostly PDF's and pre-compressed data Any reduction in performance of the web servers must be avoided. After entering the workload with default options, the Sizer outputs the configuration shown in the exhibit. Which adjustment does the systems engineer need to make to the scenario to meet the performance requirements ?

  • A. increase the RAM of the web server workload to 10 GB per VM.
  • B. Switch to manual and change the CPUs of the node configuration to a dual 10 core model
  • C. Switch to manual sizing and increase the RAM of the node configuration to 384 GB
  • D. increase the vCPU:CPU ratio of the Webserver workload to 6:1

Answer: A

 

NEW QUESTION 92
A prospect is concerned about the suitability and design of using Nutanix for an upcoming Avaya IP Office migration.
Which type of document should the SE provide?

  • A. Knowledge Base Article
  • B. Reference Architecture
  • C. Best Practice Guide
  • D. Filed Advisory

Answer: B

 

NEW QUESTION 93
A prospect has 8500GB of capacity provisioned for a non-production VMware cluster. As Part of migrating to Nutanix. the prospect agrees to convert any thick provisioned disks to thin provisioned disks. Based on additional dat a. the total active working set for the cluster has been datermined to be 1TB. When entering the Raw input workload into Sizer, what is the minimum amount of HDD Capacity required for the workload? ??

  • A. 7.5TIB
  • B. 3.5TiB
  • C. 4.0TiB
  • D. 3.0TiB

Answer: D

 

NEW QUESTION 94
An SE is performing workload discovery with an SMB prospect running SQL Server. The databases is less than 1 TB, but its performance and uptime are critical to the prospect's business operations. Sizer sugests using 1065S nodes.
Which aspects of the NX-1065S-G5 would cause an SE to filter out that nodel from Sizer's Automatic configuration? (choose two.)

  • A. Single Socket Processor
  • B. Single HDD
  • C. Single Power Supply
  • D. 1Gb Networking
  • E. Limited to 4 nodes

Answer: A,D

 

NEW QUESTION 95
An SE is meeting with a prospect that is refreshing infrastructure in 100 retail locations. Currently the stores use vSphere hosts connected to direct attached storage and are managed by 6 separate vCenter servers. On-site retail staff is unqualified to deal with any hardware break/fix issues.
Which two aspects of Nutanix solution should the SE highlight? (Choose two)

  • A. Prism Central.
  • B. Data Locality.
  • C. Cloud Connect.
  • D. Self-healing infrastructure.

Answer: A,D

 

NEW QUESTION 96
An administrator needs to move a Nutanix host from one cluster to another.
Which step should the administrator take after evacuating VMs from the host to be moved?

  • A. In Prism, highlight the host in the Hardware pane and select Remove from Metadata Ring
  • B. In Prism, highlight the host in the Hardware pane and select Remove Host
  • C. From the Task menu in Prism, select Cluster details, then un-check the host from the list
  • D. From the Task menu in Prism, select Licensing hen delete the host license.

Answer: B

 

NEW QUESTION 97
Which two targets are valid options when selecting a remote site to Prism? (Choose Two)

  • A. XI Cloud Services
  • B. Physical Cluster
  • C. Cloud
  • D. Tape Library
  • E. Network attached storage

Answer: B,C

 

NEW QUESTION 98
A guest VM should be able to tolerate simultaneous failure of two nodes or drives.
What are the minimum requirements for the Nutanix cluster?

  • A. 3 nodes with cluster RF 3 and container RF 2
  • B. 5 nodes with cluster RF 2 and container RF 3
  • C. 3 nodes with cluster RF 3 and container RF 3
  • D. 5 nodes with cluster RF 3 and container RF 3

Answer: D

 

NEW QUESTION 99
A prospect is replacing a 3-tier virtualization infrastructure made up of several ESXi hosts and a SAN. The prospect recently bought a new 4-socket server to host their SQL server workload which uses the same SAN.
Which feature allows the prospect to continue using their new server
without buying another SAN?

  • A. Acropolis Container Services(ACS)
  • B. Heterogeneous clusters
  • C. Acropolis Block Services (ABS)
  • D. Virtual Fiber Channel Controller

Answer: C

 

NEW QUESTION 100
A customer recently deployed Nutanix for VDI workloads and determine AFS is suitable for their departmental shares. They ask about infrastructure requirements providing the following file workloads specifics:
* 11.8 TB of data.
* 360000 files.
* 2400 Users.
* 800 shares.
Based on the exhibit,

which criteria shared by customer supports the requirement of additional nodes?

  • A. 360000 files.
  • B. 11.8 TB of data.
  • C. 800 shares.
  • D. 2400 Users.

Answer: A

 

NEW QUESTION 101
How long must data be 'write-cold' before Erasure Coding can begin optimization?

  • A. 1 hour
  • B. 6 hours
  • C. 7 days
  • D. 1 day

Answer: C

 

NEW QUESTION 102
How long must data be 'write-cold' before Erasure Coding can begin optimization?

  • A. 6 hours
  • B. 1 hours
  • C. 1 days
  • D. 7 days

Answer: D

 

NEW QUESTION 103
A systems engineer is creating a workload for a Sizer Scenario that requires Disaster Recovery (DR) resources with a Recovery Point Objective (RPO) of 6 hours. The "Protect VMs and other Entities" setting is set to Yes. Async is selected for the RPO. Which two other options must be enabled to have Sizer create a DR cluster? (Choose two)

  • A. Disaster Recovery
  • B. Backup
  • C. Remote Snapshot
  • D. NearSync

Answer: A,C

 

NEW QUESTION 104
A prospect is evaluating vSphere alternatives and has received FUD regarding AHV. The SE gives a demo and provides relevant case studies, but the prospect still requests a POC.
What additional option should the SE recommend to avoid a POC?

  • A. Xtract for VMs
  • B. X-Ray
  • C. Discounted Prism Pro
  • D. Nutanix Technology Bootcamp

Answer: D

 

NEW QUESTION 105
A customer needs to expand an existing cluster to accommodate workloads. The workloads require 5TB of storage capacity (1.2TB of working set data), 64GB of memory, and 10 physical CPU cores. Their current cluster is configured as follows:
* 4x NX-3060-G5 nodes
* Each node is configured with 2x E5-2620v4 processors (8 Cores each), 128GB RAM, 2x 960GB SSDs, and
4x 2TB HDDs
* The cluster is configured as RF2 and is sized for N+1 availability
* Each CVM is configured with 32GB of memory
To maintain optimal metadata balance and data availability, which configuration should be recommended?

  • A. 2x NX-3060-G5 - 2x E5-2620v4 processors, 128GB RAM, 2x 960GB SSDs, 4x 2TB HDDs
  • B. 1x NX-3060-G5 - 2x E5-2620v4 processors, 128GB RAM, 2x 1920GB SSDs, 4x 2TB HDDs
  • C. 1x NX-6035C-G5 - 2x E5-2620v4 processors, 128GB RAM, 1x 1920GB SSDs, 5x 4TB HDDs
  • D. 3x NX-1065-G5 - 2x E5-2620v4 processors, 128GB RAM, 1x 1920GB SSDs, 2x 4TB HDDs

Answer: A

 

NEW QUESTION 106
Refer to Exhibit.

When entering a Raw Input workload into Sizer, what amount of RAM should be used for the entire workload?

  • A. 64GB
  • B. 42GB
  • C. 32GB
  • D. 48GB

Answer: C

 

NEW QUESTION 107
A systems engineer is building a private cloud for internal developers that should include self-service and life cycle management for both kubernetes containers and SQL databases. which additional license feature must be purchased to provide this capability?

  • A. Nutanix Beam
  • B. Nutanix Era
  • C. Nutanix Flow
  • D. Prism Pro

Answer: D

 

NEW QUESTION 108
An administrator protected a DB VM running on a Nutanix cluster with NearSync Replication, which schedules to repeat every 15 minutes to a second site. The daily change rate is low. During nightly backup, the replication windows is missed due to write volume. Which two options describe the expected behaviour?
(choose two)

  • A. NearSync stops working and fails over to the remote site.
  • B. The system continuously tries to get to the NearSync schedule.
  • C. Protection Domain transitions back to hourly schedule.
  • D. The administrator needs to re-enable it manually

Answer: A,B

 

NEW QUESTION 109
A prospect is seeking a Nutanix solution for a mission critical application that needs to sustain two simultaneous node outages and prefers that the cluster be able to fully rebuild both data and metadata in the event hardware issues.
what is the minimum number of nodes required for the cluster?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: D

 

NEW QUESTION 110
An administrator finds that home shares cannot be configured in a new Files 3.5 deployment.
Why is this happening?

  • A. Access Based Enumeration is not enabled.
  • B. NFS default access is set to Read Only
  • C. Multi-protocol access is not configured.
  • D. The system is deployed as a single FSVM.

Answer: C

 

NEW QUESTION 111
A customer has a requirement to run a single instance Oracle Database VM on AHV that is driving over 250,000 IOPs.
Which AOS feature should be positioned to deliver the highest level of performance?

  • A. Volume Group Load Balancer
  • B. Data Locality
  • C. Shadow Clones
  • D. App Mobility Fabric

Answer: A

 

NEW QUESTION 112
......

Pass Your Nutanix Exam with NCSE-Core Exam Dumps: https://www.real4prep.com/NCSE-Core-exam.html

Verified NCSE-Core Bundle Real Exam Dumps PDF: https://drive.google.com/open?id=1sqdGGcOnuve3S8pCXlS4CPNuy3bGx8fX